Ian Ritchie Architects

Search icon

Sussex House Practical Completion

Sussex House reached practical completion and was handed over to Longmartin Properties Ltd on 31 May 2019. It is one of several mixed-use developments iRAL has designed in Covent Garden.

The building has a new façade, and the completely redesigned interior space has a new façade, in part of light transmitting insulated cast glass, and circulation core, and the completely redesigned interior space has a 4,700 sq ft flagship retail store at ground level and first floor, 9,500 sq ft of office space above and a 500 sq ft rooftop terrace.

Ian Ritchie Architects are delighted to share this fantastic achievement with the team: Hanover Cube, SG Consulting, KJ Tait, WSP, RLF, BDP and the contractor – Geoffrey Osborne Ltd and their trade contractors.